Towards the peaks with skyscrapers

Baku Tower

Completed 2014
  • General Contractor SMTS MMC
  • Area 1,7 Ha
  • Construction area 84.486 m²
  • Height of the building 277,3 m
  • Number of floors 50

Property Tower Baku

Ongoing 2014
  • General Contractor SMTS MMC
  • Area 10.000 m²
  • Construction area 39.000 m²
  • Height of the building 126,3 m
  • Number of floors 33

Fields of activity

Construction and installation of buildings and facilities requiring construction permits

Construction and commissioning of industrial, office and residential buildings

Design, preparation of design estimates and work plans

Approval of project documents, obtaining permits

Geological analysis

Reconstruction and restoration works